Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section VIl. PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM   11-5821-333-12 Section  VIl.  PREPARATION  FOR  STORAGE  OR  SHIPMENT Subject Administrative  Storage  . General . . . . . . . . . . . . . Intermediate  Storage  .  . Special  Procedures  .  .  . 6-34. GENERAL. Para Page 6-36 6-58 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-34 6-58 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-37 6-59 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-35 6-58 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The radio set units should be properly packed before shipment or placing in storage. All PMCS should be done before   storage. CAUTION Remove  batteries  before  storage.  Ruptured  cells can  spill  corrosive  chemicals  into  electronic  circuits. 6-35. SPECIAL PROCEDURES. There  is  no  need  for  special  preservation,  packaging,  packing,  or  marking.  Under  extreme  climatic  conditions, corrosion-preventive  compounds,  moisture  barriers,  and/or  desiccant  material  may  be  required.  Contact  your local  support  unit  for  these  materials. 6-36.  ADMINISTRATIVE  STORAGE. a. General.  Administrative storage is the placement of organic equipment in a limited care and preservation status  for  short  periods  of  time. b.  Procedures.  Equipment placed in storage will be capable of being restored to a working status within 24 hours.  Before  storing,  perform  the  next  major  preventive  maintenance  service  (monthly,  quarterly,  or  semiannu- al). Apply all mandatory MWOs. Ensure that only equipment rated OPERATIONALLY READY be placed in storage. Refer  to  AR  750-1.  Exceptions  to  this  policy  are  listed  in  740-90-1. (1)  Tools  and  Materials: Tool  Kit,  Electronic  Equipment  TK-101/G  (pocket  knife) Shipping  Cartons Tape (2)   Packing: Secure  dust  covers  on  equipment  connectors. Place  component  (6)  in  carton  (2). Install  packing  (5). Replace  manuals  (4). Close  flaps  (1,3)  and  seal  carton  with  tape. 6-58


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business