Click here to make tpub.com your Home Page

Page Title: POWER AMPLIFIER A2A1 ALIGNMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-919-40-2
POWER AMPLIFIER A2A1 ALIGNMENT
The alignment procedure is to be used in either of these situations: (1) the performance test calls a potentiometer out of adjustment, or (2) one of the following is
replaced:
1.
Overshoot Control AR3, AR4
2.
ALC, AR3
3.
Buffers ART, AR2
4.
Power Transistors Q3, Q6, Q10, Q11
5.
Transformers T1, T2, T3, T4, T5
6.
DC-DC Converter
The procedure consists of a preliminary setup and an adjustment procedure.
R1 = GAIN ADJUST
PRELIMINARY SETUP
ADJUSTMENTS
R13 = BIAS ADJUST
R24 = +30.5 VDC ADJUST
1. Remove the power amplifier from the amplifier/coupler.
1. Monitor TP-3 with DVM, close PTT. On bottom board adjust R24
R34 = ALC REFERENCE
Connect the test setup as shown in figure 9-3, however, to
for +30.5 + 0.5 vdc. Open PTT.
ADJUST
not connect the of coax cable at this time. The of coax cable
connected at A1J2 will be connected directly to the coaxial
2. On the 18 pin extender cable remove the jumper lead between
attenuator.
the two test points. Insert a dc ammeter in place of the jumper and
select a range of at least 100ma. Ensure that positive lead is
2. Set dc power supply (7 amp) to +24.5 vdc. Set step
inserted into test point closest to the connector on the PA module.
attenuator to 10 db.
Close PTT only long enough to adjust R13 (top board) for a reading
of 90ma.
3. Set ANT SEL to 50 ohm (bypass), VOLUME to on.
FREQUENCY KHZ to 29, 999.1, SB to USB, MODE TO
3. Adjust the rf signal generator to 29.9999 MBz at +22 dbm (150
V-TR.
mw). Refer to Note 7 on figure 9-3. Connect the rf coax cable to
A1J1 and the rf signal generator. Adjust R1, GAIN ADJUST
(topboard), for a reading of 27 mw on the power meter.
4. With DVM, monitor E8. Close PTT, adjust R34 (bottom board) for
a reading of +13.5 + 0.5 vdc.
5. Open PTT, disconnect test equipment.
85


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business