Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATIONAL CHECK. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 14-9. OPERATIONAL CHECK. Continued Step 9. POWER SUPPLY OUTPUT CHECK.  Continued Action k.  Set  Scope  CH  1  to  AC. TEST EQPT SELECTOR: Read  Scope. RESPONSE:    4 Read  Scope. RESPONSE:    5 Read  Scope. l. TEST EQPT SELECTOR: RESPONSE:   1 m.     Set     LOAD:     1 n. o. SCOPE DMM. TEST EQPT INPUT: EXT. Use  ext  probe  to  check  TP9. Set LOAD: OFF CB1: OFF 13     V:     ON TEST EQPT INPUT: RESPONSE:    4 INT Step 10. REMOTE CONTROL CIRCUIT CHECK. Action a.   Set 13   V:   OFF CAL: FCTN GEN FREQ: LEVEL: FCTN : CAL:   OFF RESPONSE: RESP  SEL: 40  kHz  (38  to  42  kHz) 500  mV  p-p  (450  to  550 mV  p-p) SINE 11 S1 TEST  EQPT  SELECTOR:  SCOPE Read  Scope. Response k. l. m. n. o. Each  response  position  should  have less  than  200  mV  p-p.  If  the  ripple voltage  is  greater  than  200  mV  p-p, heat  sink  assembly  (8A1)  is  bad. DMM  reads  12.3  to  13.7  V  dc.  If  not, wire  from  8A2CR3-C  to  8A2J2-F, or  8A2J2,  is  bad. DMM  reads  -1  to  +3  V  dc. If  not,  8A2CR3  is  bad. DMM  reads  12.3  to  13.7  V  dc. If  not,  go  to  chart  9. DMM  reads  -1  to  +3  V  dc. If  not,  8A2CR4  is  bad. Response a. Scope CH 1 reads 300 to 625 mV p-p. If  not,  go  to  chart  10. 14-6


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business