Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATIONAL CHECK. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 2-29. OPERATIONAL CHECK.  Continued Step 1. CURRENT CHECK. Action a. Connect  equipment  as  shown  in  figure 2-13. b. Set UUT RT FCTN: Z-A. c. Remove DMM lead from TP8 and TP9. Set  13  V:  ON.  Set  UUT  RT  FCTN  switch to  LD-V  and  then  to  Z-A.  Check  opera- tion  of  DIM  control  by  adjusting  it  CCW and  then  CW. Step  2.  SELF-TEST. Action a. Set UUT RT FCTN: TST. Response a. No  response. b. Responses: (1) (2) (3) Multimeter  reading  is  greater  than 0  A,  but  not  greater  than  800  mA when RT display is on. RT  displays  “Good”  for  7  seconds. Multimeter  reading  is  not  greater than  375  mA  when blank. IF: RT  does  not  turn-on. Current  is  0  or  high with RT display on. “Good”   is   not displayed   correctly. Current  is  high  with RT display blank. RT display is THEN: Go  to  chart  1. Go  to  chart  1. Go  to  chart  2. Go  to  chart  3. c. CCW  dims  the  display,  and  cw  brightens the  display.  If  not,  go  to  chart  41. Response a. Responses: 2-31


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business