Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACEMENT OF TERMINAL BLOCK TB1 (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 4-71. REPLACEMENT OF TERMINAL BLOCK TB1. Tools: Cross  tip  screwdriver Torque   screwdriver Flat  tip  screwdriver References: Paragraph  4-51  for  removal  and  installation  of  power  supply. ITEM ACTION REMARKS REMOVAL a.  Mounting  adapter b.   20   captive   screws c.  Screw  (9)  and flat  washer d.   Screw   (10) e.   Heatsink   assembly f.  Power  supply  (13) g,   Wires (8) (11) h,  Terminal  block INSTALLATION i. Terminal  block TB1 (17) TB1 (17) j. Wires k.   Power   supply   (13) Set  on  work  surface  with  back  toward you. Using  flat  tip  screwdriver,  fully  loosen  20 captive  screws  securing  heatsink  assem- bly  (11)  to  power  supply  cover  (17). Using  cross  tip  screwdriver,  remove  and retain  screw  (9)  and  flat  washer  securing heatsink  assembly  (11)  to  audio  amplifier chassis  (3). Using  flat  tip  screwdriver,  remove  and retain  screw  (10)  securing  heatsink  as- sembly  (11)  to  audio  amplifier  chassis  (3), Lay  heatsink  assembly  (11)  on  its  fins. Remove  and  retain Tag  wires  on  bottom,  of  terminal  block TB1  (17).  Using  flat  tip  screwdriver, remove  and  retain  eight  screws  securing tagged  wires  to  terminal  block  TB1  (17). Using  cross  tip  screwdriver,  remove  and retain  four  screws  (18)  and  flat  washers securing  defective  terminal  block  TB1  (17) to  heatsink  assembly  (1).  Remove  and discard  terminal  block  TB1. Using  cross  tip  screwdriver,  install  four retained  screws  (18)  and  flat  washers securing  replacement  terminal  block  TB1 to  heatsink  assembly  (1). Using  flat  tip  screwdriver,  install  eight retained  screws  securing  tagged  wires to  bottom  of  terminal Remove  wire  tags. Install  retained  power block  TB1  (17). supply  (13). See  figure  4-14. CAUTION Carefully  lay  on  fins  to ensure  casting  does  not rest  on  components  inside power  supply  cover. Refer  to  paragraph  4-51 for   removal   procedures. See  figure  4-22. See  figure  4-22. These  were  removed  in step  h. These  were  removed  in step  g. See  figure  4-14. Refer  to  paragraph  4-51 for   installation   procedures. 4-189


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business