Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACEMENT TM 11-5820-890-30-5 OF POWER CONTROL CHASSIS O-RING GASKET. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



4-70.   REPLACEMENT TM 11-5820-890-30-5 OF  POWER  CONTROL  CHASSIS  O-RING  GASKET.  Continued ITEM ACTION REMARKS INSTALLATION j. O-ring  gasket  (4) k.   Two   screws   (1)   and flat  washers  (2) l. Four  screws  (2) m.  Four  hex  screws  (11) and  flat  washers  (12) n.  Relay  K1  (15) o.   Screw   (18) p.  Terminal  block TB2 (19) Side    access q. cover  (16) Install  in  channel  on  power  control Apply  silicone  compound chassis  case  and  secure  with to  o–ring  gasket  before cyanoacrylate   adhesive. installation. Position   power   control   chassis   to   mounting   See   figure   4-20. adapter.  Using  cross  tip  screwdriver,  install  These  were  removed  in two  retained  screws  (1)  and  flat  washers step  h. (2)  securing  power  control  chassis  to bottom   shelf. Using  cross  tip  screwdriver,  install  four See  figure  4-19. retained  screws  (2)  securing  side  panel These  were  removed  in (6)  to  power  control  chassis. step  g. Using  hex  wrench,  install  four  retained See  figure  4-20. screws  (11)  and  flat  washers  (12)  secur- These  were  removed  in ing  power  control  chassis  to  power step  f. supply  chassis. Using  cross  tip  screwdriver,  install  retained  These  were  removed  in screw  (16)  securing  two  terminal  lugs  to step  e. relay  K1  (15).  Remove  wire  tags. Using  cross  tip  screwdriver,  install  retained  These  were  removed  in screw  (18),  flat  washer,  Iockwasher,  and step  d. insulating  washer  securing  two  terminal lugs  to  terminal  block  TB2  (19).  Remove wire  tags. Using  flat  tip  screwdriver,  install  four retained  screws  securing  wires  to terminal  block  TB2  (19).  Remove wire  tags. Install. See  figure  4-19. These  were  removed  in step  c. See figure 4-14. This was removed  in  step  b. Refer  to  paragraph  4-62  for installation   procedures. 4-187


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business