Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATIONAL CHECK. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 3-17. OPERATIONAL CHECK. Continued Step 12. WIRING AND SWITCH TESTS. Action a.  Turn  test  power  supply  OFF  and disconnect   it   from   test   adapter. Disconnect  scope  and  signal  generator. b.   Perform   continuity   checks   in   table   3-2 using  the  following  procedure: (1)  Set  test  adapter  switches  as  listed  in column 1 “SWITCH POSITIONS”. NOTE Do  not  change  switch  settings  until instructed  to  do  so. (2)  Connect  DMM  test  leads  to  the  points listed  in  columns  2  and  3  “DMM  (+)” and   “DMM   (-)”. NOTE CC  indicates  the  center  conductor  of a BNC connector such as ANT REF. c.   Operational   Check   is   complete. Response a.  No  response. b.   Responses   to   the   continuity   check   actions are: (1)  No  response. (2)  DMM  reading  is  as  listed  in  column  4 “RESULTS”.  If  not,  part  listed  in  column 5  “FAULT”  is  bad.  If  no  part  is  listed in  column  5,  then  use  figure  FO-19  and the  DMM  to  check  the  path  between the  points  listed  in  columns  2  and  3. 3-40


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business