Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATIONAL CHECK
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 3-17.  OPERATIONAL  CHECK. The   operational   check   provides   a   step-by-step   procedure   for   evaluating   the   reference   fixture   and   the   test adapter. If the operational check is passed, the reference fixture may be returned to service. If it does not pass the  test,  the  bad  unit  or  the  troubleshooting  chart  to  be  used  will  be  identified.  The  troubleshooting  procedures are  in  paragraph  3-20. Continuity checks of the test adapter can be performed using the schematic (figure FO-19) and an ohmmeter, if necessary.  Use  the  operational  check  in  this  manual  for  the  ECCM  fill  device. The operational check requires the use of a second RT, which is known to be good, to serve as the reference RT. Obtain  this  RT  from  another  maintenance  group. The operational check is divided into steps. Each step verifies a particular function. Follow the instruction in the “Action”  column.  Check  the  response.  If  the  response  is  correct,  proceed  with  the  next  lettered  step.  When  a Step  has  been  completed,  proceed  with  the  next  Step.  A  “No  response”  in  the  “Response”  column  means  that any  response  is  not  of  interest. When  instructed,  set  up  the  test  equipment  as  indicated  in  the  figures.  Each  figure  shows  the  proper  switch settings  for  the  test  equipment. Connect  the  test  setups  only  when  directed,  and  with  the  power  supply  set  to  OFF.  The  large current capacity of the test power supply can cause personal injury. Verify the test setup before turning  the  power  supply  on. High voltage (200 V dc) is present at mounting adapter connector J1 and inside the test adapter. Use caution when connecting the test setup and taking measurements to avoid personal injury. NOTE Two  mounting  adapters,  the  AM-7239/VRC  and  the  AM-7239B/VRC,  are  tested  with  the  follow- ing  procedures.  Before  starting  to  troubleshoot  the  mounting  adapter  AN-7239/VRC  insure  that the shorting bar is in the local position. Before troubleshooting the mounting adapter AN-7239B/ VRC insure that the LOCAL/REMOTE switch is set to the local (LCL) position. Failure to properly install the shorting bar or set the LOCAL/REMOTE to the LCL switch to the LCL position will cause the  mounting  adapter  to  fail  the  operational  check. 3-26


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business