|
| TM 11-5820-890-10-8
In that NCS personnel are also operators, they are required to perform
PMCS
Before Operation Preventive Maintenance Checks and Services
(PMCS), as shown in Chapter 8. Performing PMCS involves checks of
controls, cables, antennas, power source, self-test, keypad, data
loading, and ability to communicate. By performing PMCS, NCS
personnel are assured that all components of their radios are working
properly, or that something needs to be fixed, by the NCS operator or
unit maintenance. The PMCS charts found in Chapter 8 should be
followed exactly in the performance of PMCS. No NCS operator action
will pay greater dividends.
When they are satisfied with the results of Before Operation PMCS
LOADING RT
actions, NCS personnel load their own radios with data and sync time,
in preparation for net opening. The first three Primary Operator Tasks
provide detailed procedures.
It falls to the NCS to maintain net discipline. This responsibility includes
NET DISCIPLINE
controlling access to the net, maintaining an informal record of which
stations are in the net, and ensuring that messages are as brief as
possible and use proper language.
In that it is the NCS radio, set to the FH-M mode position, that
SYNC TIME
automatically keeps all of the net radios within the plus or minus 4
second window required for frequency hopping, the NCS must
transmit as often as necessary to maintain net sync time. A general rule
is for the NCS to transmit at least once every 24 hours in a very quiet net
and about every half hour in a heavy traffic net.
6-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |