Click here to make tpub.com your Home Page

Page Title: OPERATOR START-UP PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-890-10-8
5.2.
OPERATOR START-UP PROCEDURE
DRAW EQUIPMENT
In a typical peacetime situation, the operator will obtain required
communications gear from a communications or supply facility.
Manpack operator's equipment will include a main power battery in
addition to all radio components. Vehicular radio operator's equipment
may include a "dismount" radio (including main power battery) in
addition to all of the vehicular radio components.
ANCD
Depending upon unit policy, selected operators will probably draw
ANCDs already loaded with proper COMSEC keys, FH data, and sync
time for current unit operations. When unit SOP calls for centralized
control of ANCDs, the operator is advised when and where to obtain
ANCD support.
ASSEMBLY
Operators are expected to properly assemble manpack radios and
install required vehicular radio components in preparation for net
opening.
This includes connecting cables, antennas, handsets,
loudspeakers, and any other components that are to be used.
CAUTION
YOUR RT CAN BE DAMAGED BY
IMPROPER ATTACHMENT OF MANPACK ANTENNAS
1. To avoid damage, turn the sleeve only, not the antenna.
2. Turning the antenna can destroy the antenna connector in the RT.
5-3


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business