Click here to make tpub.com your Home Page

Page Title: CV-3633/GRC-144(V) Receive Section Conversion Gain Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
3-79.
CV-3633/GRC-144(V) Receive Section
(2) Insure that transmit waveguide switch is set to
Conversion Gain Test
the 15 GHz TEST (TO LOAD) position. For the
AN/GRC-144(V)4 optional configuration, insure that
a. Test Equipment and Materials.
Switch, Waveguide SA-1679/GRC is set to the TO
LOAD (TEST) position.
(1) Signal Generator, Hewlett Packard 626A.
(2) Frequency Counter, Hewlett Packard 5340A.
(3) Power Meter, Hewlett-Packard 432A.
(4) Thermister Mount, Hewlett Packard P486A.
(5) Thermister Mount, Hewlett Packard 478A.
(6) Adapter SMA(M) to N(F) Narda 57.
(3) Open  waveguide  connection  at  Converter-
Multiplier CV-3633/GRC-144(V) ANT 34 output and first
(7) Adapter Waveguide Coax N(F) Narda 609.
shelter waveguide connection by removing screws that
secure  Waveguide  and  the  CV-3633/GRC-144(v)
(8) Directional Coupler, Hewlett-Packard P752D.
together.
(9) Test Cable, N(M) to N(M), Pamona 1658-T-60.
(4) Move the waveguide to a safe location.
(10) Waveguide, Flexible Waveguide HP 11503A
CAUTION
Do not support test
b. Test Connections and Conditions
.
equipment by
waveguides. Test
NOTE
equipment must be
properly supported on
To perform the CV-
a suitable equipment
3633/GRC-144(V)
rack.
receive section
conversion gain test,
NOTE:
the waveguide
Locate the test
connection at 3AJ4
equipment close to the
ANT waveguide flange
CV-3633/GRC-144(V).
must be open.
NOTE
(1) Record the CV-3633/GRC-144(V) BP filters 3A3
Connect power meter to
and 3A4 dial settings.
directional coupler shown
with dashed line.
NOTE
(5) Interconnect  the  test  equipment
in
Disregard status panel
accordance with the test setup shown in figure 3-40.
waveguide switch
FREQUENCY BAND IN
USE and transmitter
c. Initial Test Equipment Calibration.
WAVEGUIDE SW
Turn on the test equipment and allow a 30 minute
indicator alarms.
warmup period.  Use the following technical manual
procedure to calibrate the test equipment.
Item
Technical Manual
Signal Generator, HP
626A
TM 11-6625-2910-14
Frequency Counter, HP
5340
TM 11-6625-2808-14
Power Meter, HP 432ATM 9-6625-2469-15
Change 6
3-112


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business