Click here to make tpub.com your Home Page

Page Title: Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
c.
Procedure.
Control setting
Step
Test
No.
equipment
Equipment under test
Test procedure
Performance standard
1
None
Controls may be in any position.
a.
Inspect all controls and mechanical
a.
No loose or missing parts; screws,
assemblies for loose or missing
nuts, and bolts are tight
screws, bolts, or nuts.
b.
Inspect subassemblies and their
b.
No physical damage (bends,
cases for physical damage and
cracks, splits, etch) evident.
condition of finish.
Painted surfaces do not show
bare metal. Panel lettering
Note. Touchup painting is recommended
legible.
whenever practicable. Screwheads. receptacles.
connectors. and other plated parts will not
be painted or polished with abrasive
c.
Inspect all connectors, plugs,
c.
All plugs and connectors are
receptacles, and meter and dial
tight All receptacles are tight
faceplates for looseness and
and free from damage. Meter
damage.
and dial faceplates are secure
and are not split or cracked.
d.
Remove fuseholder caps; inspect
d.
Fuseholders are in serviceable
fuseholder for damage and fuses
condition Each fuseholder
for correct type and rating.
contains a good fuse of proper
type and rating, as indicated on
the panel.
e.
Inspect air filters for cleanliness
e.
Air filters are in a clean and
and serviceability.
serviceable condition.
3-85


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business