| TM 11-5820-695-35
ab. Set the meter switch an the radio test set to
o.
On R-1467(P)/GRC-144(V) turn the AGC
OSC LEVEL and adjust the LEVEL ADJ control on 100
SEL switch on 70 MHz intermediate frequency amplifier
2A5 to TEST and turn meter selector switch 2A15A2S1
MHz radio frequency oscillator '1A2 for a set OSC
LEVEL ADJ indication on the radio test set meter.
on meter panel assembly 2A15A2 to CARRIER (IF).
ac. Using a screwdriver. turn the ATTEN ADJ
p.
Remove the dust cover from the ATTEN
control on Coupler, Directional CU-1890/ GRC in a
ADJ control on Coupler, Directional CU-1890/ GRC and,
clockwise direction until meter 2A15A2M1 on meter
using a screwdriver, turn the ATTEN ADJ control
panel assembly 2A15A2 indicates 150.
clockwise until mechanical stop is reached.
ad. Replace the dust cover on Coupler,
NOTE
Directional CU-1890/GRC ATTEN ADJ control.
If meter 2A15A2M1 is off scale,
ae. Set the ON/OFF switch on 100 MHz radio
reduce the POWER SET control on
frequency oscillator 1A2 to OFF.
AN/URM-52B for an on scale meter
reading. After performing step ' g,
af.
Set the AGC SEL switch on 70 MHz
increase POWER SET control for a
intermediate frequency amplifier 2A5 to DIV OFF.
dial scale indication of -71 dbm.
q.
Fine tune the SIGNAL FREQUENCY control
entry panel on the external shelter wall.
on AN/URM-52B for a peak indication on meter
ah. Reset the controls on T-1054(P /GRC-
)
2A15A2M1.
144(V) and R-1467(P)/GRC-144(V) to the original
r.
Remove the green cap from the IF GAIN
operating frequencies.
control on 70 MHz intermediate frequency amplifier 2A5
ai.
Set Switch, Waveguide SA-1679/GRC to
and, using the tuning tool, adjust the IF GAIN control
the TO ANTENNA (NORMAL) position.
until an indication of 150 is observed on 2A15A2M1. If
3-62. T-1654(P)/GRC-144V) and T-1054(P)A/ GRC-
a meter indication of 150 cannot be obtained, replace
144(V) Modulator Frequency Adjustment
the following components one at a time until a meter
indication of 150 is obtained: 70 MHz intermediate
a.
Turn on Counter Electronic, Digital Readout
frequency amplifier 2A6, amplifier mixer 2A7, and
AM/USM-207 and allow a 1-minute warmup period.
tunnel diode amplifier 2A2. Replace the green cap over
b.
On the AN/USM-207, set the controls as
the IF GAIN control on 2A5.
follows:
s.
Turn off AN/URM-52B and disconnect RF
(1)
SENSITIVITY switch to PLUG-IN.
cable CG-92D/U from Coupler, Directional CU-
1890/GRC (fig. 3-W).
(2)
FUNCTION switch to FREQ.
t.
Connect tile coaxial cable removed in step k
(3)
Time base switch to GATE TIME
-1
2
(SEC ) -10 .
to Coupler, Directional CU-1890/GRC.
(4) Upper and lower converter attenuator
u.
Using a screwdriver, turn the ATTEN ADJ
switches to 100V MAX.
control on Coupler, Directional CU-1890/GRC
counterclockwise until mechanical stop is reached.
(5) DIRECT-HETERODYNE
switch
to
HETERODYNE.
v.
Record
the
T-o054(P)/GRC
-I44(V)
operating frequency.
(6)
Mixing frequency selector switch to
100.
w.
On T-1054(P)/GRC-144(V), set controls on
radio frequency bandpass filter 1FL3 and electrical
(7)
DISPLAY control to desired display
frequency synthesizer 1A14 controls to 4800 MHz.
time.
x.
Turn the OUTPUT LEVEL switch on the
c.
Disconnect coaxial cable 1A6W2 from the
radio test set to LOW.
J1 connector on radio transmitter modulator 1A8.
y.
Set the ON/OFF switch on 100 MHz radio
d.
Disconnect coaxial cable 1A8W1 from the
frequency oscillator 1A2 to ON.
A1J1 connector on transmitter frequency mixer stage
1A9.
z.
Set the meter switch on the radio test set to
CR1. The radio test set meter indication shall be in or to
e.
Connect the equipment as shown in view A,
the right of the yellow band.
connected to A1J1 on 1A9.
aa. Set the meter switch on the radio test set to
CR2. The radio test set meter indication shall be in or to
the right of the yellow band.
Change 6
3-79
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |