|
| TM 11-5820-670-30
2-30. AUDIO LEVEL ADJUSTMENT.
TEST EQUIPMENT AND MATERIALS
Maintenance Kit MK-1035/ARC-131
Signal Generator AN/URM-103
Signal Generator AN/URM-127
Spectrum Analyzer TS-723 A/U
Fuseholder MX-1730/U
Power Supply PP-2953/U
All cables are part of MK-1035/ARC
TEST SETUP
Connect equipment as shown in test setup diagram. Turn on all equipment and allow at least 5 minutes
for warmup.
EL1AT141
INITIAL EQUIPMENT CONTROL SETTINGS
Set equipment controls as indicated in the following table.
2-132
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |