Click here to make tpub.com your Home Page

Page Title: GEARBOX ASSEMBLY A9700 ALINEMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-670-30
2-29. GEARBOX ASSEMBLY A9700 ALINEMENT.
TEST EQUIPMENT AND MATERIALS
Maintenance Kit MK-1035/ARC-131
Power Supply PP-2953/U
TEST SETUP
Connect equipment as shown in test setup diagram. Turn on equipment and allow 5 minutes for
warmup.
ALINEMENT PROCEDURE
1. Place test set +28 vdc ON-OFF switch to ON, and adjust power supply output for +27.5 vdc.
2. Place test set +28 vdc ON-OFF switch to OFF, and power supply power switch to OFF.
3. Remove vhf tuner A1000 (para 2-68), oscillator buffer A6000 (para 2-89), and rf oscillator
assembly A2000 (para 2-70) from gearbox.
4. Place test set +28 vdc ON-OFF switch to ON, and power supply power switch to ON.
5. Set control unit frequency selectors to 53.00 MHz and allow gearbox to cycle.
6. Place test set +28 VDC ON-OFF switch to OFF.
2-130


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business