|
| TM 11-5820-477-30
2-4. preliminary Procedures (figure 2-1 )
Before troubleshooting can be performed, the control unit must be installed in a bench test setup. Refer to the
operator's and unit maintenance manual, TM 11-5820-477-12, for bench test setup data. For component checks,
perform the following:
a. Release the two front clamps and slide the remote or local control unit chassis out of its case.
b. Loosen four captive screws and remove component board A202 (remote control unit) or Al 02 (local control
unit) from chassis.
c. Place on bench without disconnecting connector P201 from J204 (remote control unit) or P102 from J104
(local control unit).
cf. Upon completion of tests, replace component board and secure with four captive screws.
e. Slide chassis into its case, close the two front clamps.
2-5. Dc Resistance of Transformers and Coils
Dc resistance readings are made with components disconnected. Determine resistance between terminals as
indicated in tables 2-1 and 2-2.
CAUTION
Do not make any resistance measurements on control units except as specified. Current
in multimeter battery can destroy transistors. In some cases, 0.1 volt applied between
base and emitter in reverse direction can destroy the transistor.
Table 2-1. Remote Control Unit Dc Resistance
Transformer or Coil
Terminals
Ohms
80 10%
T201
1-2
60 10%
3-4
70 10%
5-6
T202
1-2
125 20%
100 20%
3-4
75 20%
5-6
6-7
82 20%
5-7
50 20%
T203
1-2
5 25%
6 25%
2-3
4-5
0.9 25%
FL201
2.75 10%
1-2
FL202
1-2
2.75 10%
K201
480 10%
1-5
2-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |