|
| TM 11-5820-401-34-3/0967-LP-432-3060
A5200 SQUELCH AMPLIFIER ALINEMENT, OLD SQUELCH LEVEL. (CONT)
5-27.
TEST SETUP. Connect the equipment as shown in test setup diagram
. Remove R-442/VRC top
cover. (See paragraph 2-7.)
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
t.able. When using alternate equipment, inject 20-v rf with 7.3-kHz modulation; deviation as per
.
alinement requirements, carrier frequency determined by test requirements.
5-124
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |