Click here to make tpub.com your Home Page

Page Title: CHART 4-3. SINAD Test Failure Troubleshooting A1000 Assembly (Sheet 1 of 8)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-401-34-3/0967-LP-432-3060
4-13.
TROUBLESHOOTING FLOW CHARTS. (CONT)
CHART 4-3
SINAD Test Failure Troubleshooting A1000 Assembly
(Sheet 1 of 8)
NOTES
1. Ground probe B. Adjust MM-100E RANGE
switch as needed.
2. Power supply and battery input voltage should
already have been checked.
3. Make sure that P1005 is connected to J1005
and that the AN/GRM. 114A 1-kHz control is
adjusted for 8-kHz deviation on the DEV meter
before taking the following readings.
4-68


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business