|
| TM
11-5820-40134-3/0967-LP-432-3060
4-10.
RECEIVER SELECTIVITY TEST. (CONT)
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table.
CONTROL AND SWITCH SETTINGS
CONTROL OR SWITCH
POSITION/SETTING
EQUIPMENT
ON
SQUELCH
MK-1978/VRC
AUX POWER
ON
AUDIO
MUTED
KEY
RCVE
NORMAL
X-MODE (RT)
POWER
R-442/VRC
ON
VOLUME
Fully counterclockwise
BAND
30.00
MC-TUNE-KC
OLD ON
SQUELCH
ON
LIGHT
AN/GRM-114A;
See test setup diagram
MM-100E
4-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |