|
| TM 11-5820-401-34-3/0967-LP-432-3060
3-10. RECEIVER SELECTIVITY TEST. (CONT)
TEST EQUIPMENT AND MATERIALS
Power Supply PP-1104(*)/G
Matching Unit CN-901/U
Frequency Counter AN/USM-207
Rf Cables (two) RG-58/U
Signal Generator AN/URM-103
Maintenance Kit MK-1978/VRC
Adapter (T-Connector) UG-274 B/U
TEST SETUP. Connect equipment as shown in test setup diagram
Turn on test equipment. Allow at least 15 to 30 minutes for warmup.
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table. If using alternate test equipment, adjust for 30.00 MHz, minimum rf input level, and no
modulation.
3-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |