Click here to make tpub.com your Home Page

Page Title: INITIAL EQUIPMENT CONTROL SETTINGS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-401-34-3/0967-LP-432-3060
3-8. RECEIVER AUDIO RESPONSE TEST(NORMAL MODE). (CONT)
TEST EQUIPMENT SETUP. Connect test equipment as shown in test setup diagram
NOTE:
AN/URM-127 CONNECTED TO AN/URM-103
AT START OF TEST. DOTTED LINE SHOWS
CONNECTION TO AN/USM-207 FOR FRE-
QUENCY VERIFICATION DURING
PROCEDURE.
Turn on test equipment. Allow at least 15 to 30 minutes for warmup.
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table. If using alternate test equipment, adjust for 64.00 MHz, 20-v rf input level, 1-kHz modulation,
and 8-kHz frequency deviation.
CONTROL AND SWITCH SETTINGS
POSITION/SETTING
CONTROL OR SWITCH
EQUIPMENT
100
FREQUENCY TUNING-MC
AN/USM-207
TRACK
POWER
MIN (fully counterclockwise)
DISPLAY
0.3 V MAX (both switches to left)
INPUT
103 (black knob)
GATE TIME
PLUG IN
SENSITIVITY
FREQ
FUNCTION
DIRECT
DIRECT/HETERODYNE
3-22


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business