|
| TM 11-5820-401-34-3/0967-LP-432-3060
3-3. RECEIVER SENSITIVITY TEST. (CONT)
TEST SETUP. Connect equipment as shown in test setup diagram
.
Turn on test equipment. Allow at least 15 to 30 minutes for warmup.
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table. if using alternate test equipment, adjust for 30.00 MHz, 0.5- rf input level, 1-kHz
modulation, and 8-kHz frequency deviation.
CONTROL AND SWITCH SETTINGS
POSITION/SETTING
EQUIPMENT
CONTROL OR SWITCH
100
FREQUENCY TUNING-MC
AN/USM-207
POWER
TRACK
DISPLAY
MIN (fully counterclockwise)
INPUT
0.3 V MAX (both switches to left)
10 (black knob)
GATE TIME
SENSITIVITY
PLUG IN
FUNCTION
FREQ
DIRECT/HETERODYNE
DIRECT
3-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |