• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  29    30    31    32    33  34  35    36    37    38    39  
img
TB 9-2320-387-35-8
3-30. Insert kickplate (72) into grooves of right rail weldment (29) and left rail weldment (32).
3-31. Insert quick-release pin (71) through hole (70) in kickplate (72), left rail weldment (32), and
integrated rack (4).
71
70
72
4
~
32
~
29
72. FOOTREST WELDMENT 889567-21 QTY. 1
Figure 5-24.
5-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.