• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued
Section III. SINCGARS MOUNTING TRAY, AMP GUARD, AND FBCB2 COMPONENTS INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vsq-2(V) For Vehicle Truck, Utility: Command And Control/General Purpose Vehicle, Iap Armor Ready, M1165A1 (2320-01-540-2017) Page Navigation
  23    24    25    26    27  28  29    30    31    32    33  
img
TB 9-2320-387-35-8
3-5. Install antenna power switch box (3) on integrated rack (4) using two capscrews (6),
four washers (7), two lockwashers (8), and nuts (9).
6
7
3
4
~
7
8
9
6.
CAPSCREW B1821BH025C075N QTY. 2
7.
WASHER 2436161 QTY. 4
8.
LOCKWASHER MS35338-44 QTY. 2
9.
NUT 9419143 QTY. 2
Figure 5-17.
3-6. Install antenna power switch cover (1) on antenna power switch box (3) with four existing
screws (2).
2
1
3
Figure 5-18.
5-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.