• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section IV. DAGR INSTALLATION - Continued
Section IV. DAGR INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  32    33    34    35    36  37  38    39    40    41    42  
img
TB 9-2320-387-35-7
4-12. Locate, mark, and drill one 0.125-in. diameter pilot hole (29) in air intake stack support bracket (28).
4-13. Using support bracket (30) as template, drill 0.125-in. diameter pilot hole (29) in air intake stack
support bracket (28).
4-14. Enlarge drilled holes (29) in air intake stack support bracket (28) to 0.297-in. diameter.
4-15. Install two inserts (27) in air intake stack support bracket (28).
4-16. Install antenna (26) on support bracket (30) with lockwasher (32) and screw (33).
4-17. Install support bracket (30) and antenna (26) on air intake stack support bracket (28) with two
screws (31) and lockwashers (32).
26
27
32
33
28
32
31
0.63
30
2.25
29
26.
ANTENNA 013-1981 010 QTY. 1
27.
INSERT 12446871-3 QTY. 2
30.
SUPPORT 12506676 QTY. 1
31.
SCREW MS35206-267 QTY. 2
32.
LOCKWASHER MS35338-43 QTY. 3
33.
SCREW MS35207-261 QTY. 1
Figure 5-28.
5-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.