• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 5. INSTALLATION PROCEDURES
Section II. INTEGRATED RACK INSTALLATION - Continued

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  7    8    9    10    11  12  13    14    15    16    17  
img
TB 9-2320-387-35-7
2-4. Remove three existing rivets (6) from tunnel floor (3).
2-5. Locate and mark three holes (4) in tunnel floor (3).
2-6. Enlarge three holes (8) in tunnel floor (3) to 0.391-in.
2-7. Drill three 0.531-in. diameter holes (4) in tunnel floor (3).
2-8. Install three inserts (5) in tunnel floor (3).
2-9. Install three inserts (7) in tunnel floor (3).
4
5
3
6
7
~
7.00
4
C
L
4
8
5. INSERT 12446871-16 QTY. 3
7. INSERT 12446871-5 QTY. 3
Figure 5-2.
5-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.