|
| TB 9-2320-387-35-5
21-12. Route power cable (31) under right side tunnel insulation (30) to cab enclosure panel.
21-13. Remove nut (27), clamp (26) and antenna cable (4) from screw (20) on standard production radio
rack (28).
21-14. Secure power cable (31) with existing clamp (26) and antenna cable (4) to standard production
radio rack (28) with screw (20) and nut (27).
28
20
4
26
27
31
31. PLGR POWER CABLE 9728558-10 QTY. 1
31
~
30
Figure 5-65.
5-49
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |