|
| TB 9-2320-387-35-4
24-48. Route all cables (79) forward from step 24-28 through cargo access hole (81) and in between
tunnel (82) and right rear seat (80).
81
80
79
~
82
Figure 5-104.
NOTE
Perform steps 24-49 and 24-50 if supplemental heater is not
installed. Perform 24-51 and 24-52 if supplemental heater is
installed.
Do not route TAC-SAT or HF radio speaker cables through
tunnel.
24-49. Locate, mark, and drill three 0.147-in. diameter holes (83) in side of tunnel (82), evenly spaced
apart.
24-50. Secure cables (79) to side of tunnel (82) with three clamps (84) and self-tapping screws (85).
24-51. Locate, mark, and drill two 0.147-in. diameter holes (83) in side of tunnel (82), evenly spaced apart.
24-52. Secure all cables (79) to side of tunnel (82) with two loop clamps (84) and self-tapping screws (85),
and clamp (84), existing bracket (87), and screw (86).
83
82
83
82
~
83
~
79
84
84
85
84
84
79
85
85
86
85 87
84. LOOP CLAMP MS21333-75 QTY. 3
85. SELF-TAPPING SCREW 9421073 QTY. 2
Figure 5-105.
5-80
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |