Click here to make tpub.com your Home Page

Page Title: Route all cables
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-387-35-4
24-48. Route all cables (79) forward from step 24-28 through cargo access hole (81) and in between
tunnel (82) and right rear seat (80).
81
80
79
~
82
Figure 5-104.
NOTE
Perform steps 24-49 and 24-50 if supplemental heater is not
installed. Perform 24-51 and 24-52 if supplemental heater is
installed.
Do not route TAC-SAT or HF radio speaker cables through
tunnel.
24-49. Locate, mark, and drill three 0.147-in. diameter holes (83) in side of tunnel (82), evenly spaced
apart.
24-50. Secure cables (79) to side of tunnel (82) with three clamps (84) and self-tapping screws (85).
24-51. Locate, mark, and drill two 0.147-in. diameter holes (83) in side of tunnel (82), evenly spaced apart.
24-52. Secure all cables (79) to side of tunnel (82) with two loop clamps (84) and self-tapping screws (85),
and clamp (84), existing bracket (87), and screw (86).
83
82
83
82
~
83
~
79
84
84
85
84
84
79
85
85
86
85 87
84. LOOP CLAMP MS21333-75 QTY. 3
85. SELF-TAPPING SCREW 9421073 QTY. 2
Figure 5-105.
5-80


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business