|
| TB 9-2320-387-35-3
17-31. Locate, mark, and drill two 0.147-in holes (600 in cab floor (61).
17-32. Secure antenna cable (44) to cab floor (61) with two loop clamps (54) and two screws (55).
17-33. Route antenna cable (44) under right-side tunnel insulation (28).
55
55
54
59
54
60
61
~
28
44
54. LOOP CLAMP MS21333-67 QTY. 2
54. SELF-TAPPING SCREW 9416639 QTY. 2
Figure 5-72.
17-34. Route antenna cable (44) between integrated rack (26) and engine access cover (62) and through
access cutout.
44
26
62
Figure 5-73.
5-54
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |