| ||||||||||
| 
 
  | ![]() TB 9-2320-280-35-7 
6-5. Connect wire (8) to existing positive 12V battery terminal end (10) with existing screw (9) and 
nut (11). 
9 
10 
11 
8 
Figure 5-9. 
6-6. Position cab enclosure panel (12) in rear floor pan (20) and rear of B-beam (21). Do not secure cab 
enclosure panel (12) at this time. 
6-7. Route ground cable (16) through battery box hole (6). 
6-8. Secure terminal lug (14) to center terminal of terminal board (13) with nut (15), and secure 
terminal lug (19) to shunt (18) with existing screw (17). 
6-9. Install four additional nuts (15) on terminal board (13). 
12 
13 
14 
15 
16 
17 
6 
18 
~ 
~ 
19 
21 
20 
15. PLAIN-ASSEMBLED NUT  271169  QTY. 5 
16. GROUND CABLE ASSEMBLY  12480567-1  QTY. 1 
Figure 5-10. 
5-8 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |