|
| TB 9-2320-280-35-6
6-5. Connect wire (8) to existing positive 12V battery terminal end (10) with existing screw (9) and
nut (11).
9
10
11
8
Figure 5-9.
6-6. Position cab enclosure panel (12) in rear floor pan (20) and rear of B-beam (21). Do not secure cab
enclosure panel (12) at this time.
6-7. Route ground cable (16) through battery box hole (6).
6-8. Secure terminal lug (14) to center terminal of terminal board (13) with nut (15), and secure
terminal lug (19) to shunt (18) with existing screw (17).
6-9. Install four additional nuts (15) on terminal board (13).
12
13
14
15
16
17
6
18
~
~
19
21
20
15. PLAIN-ASSEMBLED NUT 271169 QTY. 5
16. GROUND CABLE ASSEMBLY 12480567-1 QTY. 1
Figure 5-10.
5-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |