|
| TB 9-2320-280-35-13
20-13.
Remove paint from vicinity of left overhead rail hole (9). Apply anti-seize compound as required.
20-14.
Fabricate ground strap (22) from 6-in. length of braided wire and two terminal lugs.
20-15.
Install ground strap (22) on left overhead rail (7) with capscrew (17) and two lockwashers (18).
20-16.
Locate, mark, and drill one 0.281-in. diameter hole (19) in antenna overcab mount (5).
20-17.
Remove paint from vicinity of antenna overcab mount hole (19). Apply anti-seize compound as
required.
20-18. Install ground strap (22) on antenna overcab mount (5) with capscrew (23), two lockwashers (18),
washer (20), and nut (21).
20-19. Repeat steps 20-13 through 20-18 for right side.
17.
CAPSCREW B1821BH025C100N QTY. 8
18.
LOCKWASHER MS45904-71 QTY. 14
19
7
20.
WASHER 2436161 QTY. 2
21.
NUT 9419143 QTY. 2
5
22.
GROUND STRAP
9
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-141 QTY. 4
23. CAPSCREW B1821BH025C075N QTY. 2
7
5.00
9
2.00
19
18
20 21
17
23
18
18
18 22
Figure 5-78.
5-58
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |