|
| TB 9-2320-280-35-13
20-7. Remove and discard four existing bolts from left and right B-pillars.
20-8. Remove paint from vicinity of four holes (11) on left B-pillar mounting (12). Apply anti-seize
compound as required.
20-9. Install left overhead rail (7) on left B-pillar mounting (12) with four capscrews (13) and
washers (14). Do not tighten capscrews (13).
7
11
14
12
13
Figure 5-75.
20-10. Remove paint from vicinity of four holes (16) on right side of vehicle B-pillar (15). Apply anti-seize
compound as required.
20-11. Install right overhead rail (8) on right B-pillar mounting (15) with four capscrews (13) and
washers (14). Do not tighten capscrews (13).
8
16
13
13. CAPSCREW B1821BH025C138N QTY. 8
14
15
14. WASHER 2436161 QTY. 8
Figure 5-76.
5-56
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |