|
| TB 9-2320-280-35-1
NOTE
Before performing step 21-16, loosen standard rack top mounting
bolts to allow cable underneath rack. (Refer to TM 9-2320-280-20
or TM 9-2320-387-24.)
21-16. Route cable (7) from dash (25) under standard rack (27).
25
27
7
Figure 5-74.
NOTE
Before performing step 21-17, tighten top mounting bolts on
standard rack, if necessary. (Refer to TM 9-2320-280-20 or
TM 9-2320-387-24.)
21-17. Route cable (7) from underneath standard rack (27) rearward along tunnel floor (29) and place on
PLGR bracket assembly (28).
21-18. Coil excess cable (7) and store under standard rack (27), using tiedown strap as necessary.
27
28
29
7
Figure 5-75.
5-60
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |