|
| TB 9-2320-280-35-1
18-3. Attach shrink tubing (7), four terminal lugs (9), (10), (13), and (14), and splices (8) to two black
leads (11), white lead (6), green lead (12), and two red leads (5) on MTS power cable (2). (Refer to
TM 9-2320-280-20 or TM 9-2320-387-24 for terminal connector repair.)
2
7.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
8.
SPLICE NAS1387-4 QTY. 4
9.
TERMINAL LUG MS25036-103 QTY. 1
10.
TERMINAL LUG MS25036-108 QTY. 1
13.
TERMINAL LUG MS25036-150 QTY. 1
6
14.
TERMINAL LUG MS25036-154 QTY. 1
5
7
8
17.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
7
8
9
11
14
12
10
13
Figure 5-59.
18-4. Install negative leads (6) and (11) on outboard ground strap (18) with existing nut (16).
18-5. Install positive leads (5) and (12) on outboard 24V terminal board (15) with existing nut (16).
18-6. Secure all leads together with tiedown strap (17).
18-7. Tighten right side tunnel insulation (4). (Refer to TM 9-2320-280-20 or TM 9-2320-387-24.)
18-8. Coil all excess cable and store under standard rack.
12
7
5
16
17
15
18
11
16
6
Figure 5-60.
5-49
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |