|
| TB 9-2320-280-35-1
NOTE
Perform steps 11-12 through 11-21 for AN/VRC-92F only.
11-13. Install two clamps (21) on underside of standard rack (4) with two existing lockwashers (24),
screws (25), and nuts (20).
11-14. Install clamp (21) on underside of standard rack (4) with existing lockwasher (24), screw (25), and
nut (20).
11-15. Attach power cable (5) and two speaker cables (6) to MT-6352/VRC mounting base connectors.
11-16. Route power cable (5) and speaker cables (6) under standard rack (4), and secure using clamp (10),
lockwasher (8), screw (7), nut (11), clamp (9), and existing lockwasher and screw.
11-17. Secure power cable (5) and speaker cables (6) to standard rack (4) support with tiedown strap (12).
11-18. Route power cable (5) through grommet (13) under tunnel insulation (14). Attach negative lead (16)
to negative power stud (17), and positive lead (15) to positive power stud (18), using existing
mounting hardware.
11-19. Install speaker cables (6) on loudspeakers (19).
11-20. Coil extra speaker cables (6) under lower equipment shelf and secure with tiedown strap (12).
5.
POWER CABLE A3154857-1 QTY. 1
6.
SPEAKER CABLE A3014038-3 QTY. 2
7.
SCREW MS35191-273 QTY. 1
8.
LOCKWASHER MS35338-43 QTY. 1
9.
LOOP CLAMP MS21333-76 QTY. 1
10.
LOOP CLAMP MS21333-115 QTY. 1
6
11.
NUT MS35650-302 QTY. 1
5
4
12.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
7
25
21.
LOOP CLAMP MS21333-112 QTY. 3
8 22.
ANTENNA CABLE A3014031-8 QTY. 1
24
9
23
15 16
24
EXISTING
10
HARDWARE
22 21
11
20
18
~
EXISTING
12
HARDWARE
17
21
20
13
6
19
21
14
20
Figure 5-26.
5-21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |