Click here to make tpub.com your Home Page

Page Title: Precision Lightweight GPS Receiver (PLGR) (AN/PSN-11)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM
11-5820-890-10-8
All ANCD users, including operators, are required to change ANCD
REQUIREMENT
battery/batteries whenever change is needed. Batteries should be
changed as soon as feasible after the LOW BAT message appears in
the ANCD display window.
The ANCD will retain stored data for two minutes after the batteries
PROTECTING
have been removed. This gives you plenty of time to replace the spent
STORED DATA
batteries with new ones without risk of losing your stored data.
If you lose your data while replacing batteries, you will need to have
IF STORED DATA
the internal ANCD software reactivated. Should you experience this
IS LOST
situation, take your ANCD to your unit maintainer for reactivation and
reloading.
TB 11-5820-890-12, Operator and Unit Maintenance for
REFERENCES
AN/CYZ-10, Automated Net Control Device (ANCD).
TM  11-5810-394-14&P  Operator's;  Unit,  Direct  Support,  and
Specialized Repair Activity Maintenance Manual with Repair Parts and
Special Tools List for Automated Net Control Device.
8.2f.
Precision Lightweight GPS Receiver (PLGR) (AN/PSN-11)
The replacement of main power and hold-up batteries is the primary
OPERATOR MAINTENANCE
operator requirement in PLGR maintenance.
TM 11-5825-291 -13, Operations and Maintenance Manual, Satellite
REFERENCE
Signal Navigation Set, AN/PSN-11
8-22


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business