Click here to make tpub.com your Home Page

Page Title: Initial Test Equipment Calibration-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
Step
Control Setting
No Test Equipment
Equipment Under Test
Test Procedure
Performance Standard
4
Same as step 1.
N/A.
a. Remove the test
a. None.
lead (LO) from
the mount in the
R-1467(P)A/GRC-
144(V) SPECIAL
TOOLS AND SPARE
FUSES compartment.
b. Set the meter
b. None.
panel assembly
2A15A2 switch to
the + TEST position.
c.  Connect probe on
c.
The test point
one end of test meter
indication
lead to TEST LEAD
should
jack on meter panel
read 60 to140
assembly 2A15A2 and
connect probe on
other end of test
lead to the CV-3633/
GRC-144(V) LO PWR
test point.
5
N/A.
N/A.
To calibrate the
None.
power threshold
alarm, perform the
following steps:
a. Using a small tuning-
tool turn the
CV-3633/GRC-144(V)
LO PWR screwdriver
adjustment control
clockwise until the
status panel ALARM
SUMMARY indicator
just lights red.
b. Turn the LO PWR
screwdriver adjust-
ment control counter-
clockwise until the
status panel ALARM
SUMMARY indicator
just changes from
red to green; then
continue adjustment
one full turn counter-
clockwise.
Change 6
3-111


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business