Click here to make tpub.com your Home Page

Page Title: Section IV. OPERATOR' MAINTENANCE INSTRUCTORS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-554-12
Section III. OPERATIONS
screwdriver. Tighten the locknut after adjustment.
9-8. Operating Procedures
NOTE
After the regulator has been installed and the
A 10- to 30-minute warmup period should
installation wiring is checked, proceed as follows:
be allowed before adjustment of output
a .See that the regulator and the equipment connected
voltage, when a very exact setting is
to it are turned off.
necessary.
b. Apply power to the unit; set the circuit breaker to
e. Energize the equipment connected to the output
ON (up). The LINE pilot lamp should light.
receptacles and note that the output voltage remains
within the rated accuracy.
NOTE
9-9. Stopping Procedures
If an abnormal indication is obtained
during the starting procedure, higher
a. Turn off the equipment by setting the circuit breaker
category maintenance is necessary.
to OFF (down).
c. Connect Multimeter AN/USM-223 to the OUTPUT
b.  Observe  that  the  LINE  indicator  lamp  is
extinguished.
d  Remove the protective cap on the OUTPUT
VOLTAGE control, loosen the locknut, and adjust the
control to the desired output voltage with a
Section IV. OPERATOR' MAINTENANCE INSTRUCTORS
S
9-10. General
Operator's maintenance instructions are covered in paragraph 3-19 through 3-22. Cleaning is covered in paragraph
|
9-11. Operator's Daily Checks and Services Chart for Regulator, Voltage CN-1214/G
B-Before
Item
Interval
Equipment is not ready/
No.
available if:
Item to be inspected
Procedures
B
D
A
W
M
Taps and settings
Check that all taps and
If equipment fails to perform
settings match input power
within the rated operating
and load requirements.-
specifications..
Section V. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
daily and monthly services are a part of the quarterly
preventive maintenance checks and services and must
9-12. General
be  performed  concurrently.  All  deficiencies  or
Organizational maintenance instructions are covered in
shortcomings will be recorded in accordance with the
requirements of TM 38-750. Perform all the checks
covered in paragraph 3-29.
and services listed in the quarterly preventive
maintenance checks and services chart (para 9-15) in
|9-13. Deleted.
the sequence listed.
9-14. Quarterly Maintenance
9-15. Deleted.
Quarterly  maintenance  checks  and  services  on
Regulator, Voltage CN-1214/G are required. Periodic
Change 6 9-4


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business