Quantcast Install CPU isolation kit - TB-9-2320-387-35-40043

 

Click here to make tpub.com your Home Page

Page Title: Install CPU isolation kit
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Place mounting bracket - TB-9-2320-387-35-40042
Up
TB-9-2320-387-35-4 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Remove paint from four mounting holes - TB-9-2320-387-35-40044


TB 9-2320-387-35-4
8-9. Install CPU isolation kit (33) on integrated rack (7) with four existing studs (19),
washers (35), lockwashers (36), and nuts (37).
8-10. Install CPU (26) on CPU isolation kit (33) with two existing fastener guards (34).
8-11. Install existing ground strap (28) on stud (27) on CPU (26) with existing wingnut (29),
lockwasher (30), and washer (31).
8-12. Connect W3 cable (42) from Serial Interface Adapter Device (SIAD) (44) to J3 connector (39) on
FBCB2 processor (26).
8-13. Connect W1 cable (41) to J1 connector (40) on FBCB2 processor (26).
8-14. Connect W2 cable (43) from J4 connector (38) on FBCB2 processor (26) to FBCB2 display unit (32).
8-15. Route W3N cable (45) from SIAD (44) to integrated rack (7).
26
31
30
29
27
28
33
26
37
36
35
32
34
45
34
7
44
26
38
43
39
40
42
41
26.
CPU 881292-1 QTY. 1
33.
CPU ISOLATION KIT 872826-2 QTY. 1
35.
WASHER MS27183-10 QTY. 4
36.
LOCKWASHER MS35338-44 QTY. 4
37.
NUT MS35649-2252 QTY. 4
28
19
Figure 5-29.
5-21


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business