Quantcast CHAPTER 1. INTRODUCTION - TB-9-2320-387-35-20011

 

Click here to make tpub.com your Home Page

Page Title: CHAPTER 1. INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Up
TB-9-2320-387-35-2 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
CHAPTER 2. PURPOSE OF INSTALLATION - TB-9-2320-387-35-20013


TB 9-2320-387-35-2
INTRODUCTION
Section I. SCOPE
1-1.
This technical bulletin provides installation instructions for Command, Control, Communications,
Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) equipment. The C4ISR
equipment shall be installed in the following vehicles:
Truck, Utility: Up-Armored Carrier, 4x4, M1114
1-2.
The information contained in this technical bulletin is the official authorization to perform the
installation of the C4ISR equipment at the direct support maintenance level through contract
maintenance teams.
Section II. NOTES
2-1.
This technical bulletin is not an authorization for requisition or turn-in of vehicles.
2-2.
This technical bulletin does not establish quantity or types of vehicles assigned to using units.
Section III. GENERAL INFORMATION
3-1.
Included in the C4ISR equipment are:
a. Single Channel Ground and Airborne Radio System (SINCGARS), Radio Set
AN/VRC-88F/89F/90F/91F/92F Series
b. Force XXI Battle Command, Brigade-and-Below (FBCB2), AN/UYK-128(V)4
c. Frequency Hopping Multiplexer (FHMUX), Td-1456/VRC
d. Precision Lightweight Global Positioning System Receiver (PLGR), AN/PSN-11
e. Enhanced Position Location Reporting System (EPLRS), MK-2467A/NSQ-1
f. Vehicular Intercommunication Set (VIC-3), AN/VIC-3(V)20
g. Additional terminal boards
3-2.
The C4ISR equipment becomes operable when all the components are installed in the vehicle and
correct power is supplied.
Section IV. MAINTENANCE FORMS, RECORDS, AND REPORTS
Use the following to report any discrepancies:
a. Reports of Maintenance and Unsatisfactory Equipment. See chapter 4, sections VI through VIII
for information.
b. Report of Packaging and Handling Deficiencies. See chapter 4, sections VI through VIII for
information.
c. Discrepancy in Transportation Deficiency Report (TDR) (SF361). See chapter 4, sections VI
through VIII for information.
Section V. CONSOLIDATED INDEX OF ARMY PUBLICATIONS
Refer to the latest issue of DA Pam 25-30 to determine whether there are new changes or additional
publications pertaining to the C4ISR equipment.
1-1/(1-2 blank)


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.