Quantcast Section XXI. MTS CONTROL BOX INSTALLATION - TB-9-2320-280-35-20084

 

Click here to make tpub.com your Home Page

Page Title: Section XXI. MTS CONTROL BOX INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Section XX. MTS MOUNT AND PLGR BRACKET INSTALLATION - TB-9-2320-280-35-20083
Up
TB-9-2320-280-35-2 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Install MTS control unit - TB-9-2320-280-35-20085


TB 9-2320-280-35-2
Section XXI. MTS CONTROL BOX INSTALLATION
NOTE
Ensure all holes have been drilled and inserts installed. (Refer to
chapter 5, section VII.)
21-1. Using MTS control box as template, locate, mark, and cut two 0.750-in. holes (2) in left-side tunnel
insulation (1).
2
1
Figure 5-70.
Change 1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business