Quantcast Section VII. INTEGRATED RACK INSTALLATION - TB-9-2320-280-35-20038

 

Click here to make tpub.com your Home Page

Page Title: Section VII. INTEGRATED RACK INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Secure 24V terminal board power wire terminal lug
Up
TB-9-2320-280-35-2 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Remove two inserts - TB-9-2320-280-35-20039


TB 9-2320-280-35-2
Section VII. INTEGRATED RACK INSTALLATION
NOTE
It is necessary to drill all holes for mounting MTS to tunnel before
installing integrated rack.
Perform steps 7-1 through 7-5 only when installing MTS.
Remove left side tunnel insulation. (Refer to TM 9-2320-280-20.)
7-1. Drill out rivet from floor (4), enlarge hole (3) to 0.390-in. diameter, and install screw thread
insert (5) in floor (4).
NOTE
Ensure all holes are located on flat surface of tunnel ribs.
7-2. Using MTS mounting base bracket as template, locate, mark, and drill three 0.390-in. diameter
holes (2) in floor (4).
7-3. Using control box as template, locate, mark, and drill four 0.390-in. diameter holes (1) in floor (4).
7-4. Install seven screw thread inserts (5) in floor (4).
7-5. Install left side tunnel insulation. (Refer to TM 9-2320-280-20.)
2
4.00
1
3
4.88
~
4
5
5. INSERT 12446871-2 QTY. 8
Figure 5-16.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business